Lake Andes-Wagner project : hearing before the Subcommittee on Water and Power of the Committee on Energy and Natural Resources, United States Senate, Ninety-ninth Congress, first session on S. 252, a bill to authorize the Secretary of the Interior to construct, operate, and maintain the Lake Andes-Wagner Unit, South Dakota Pumping Division, Pick-Sloan Missouri Basin Program, South Dakota, Wagner, SD, November 2, 1985.
Saved in:
Corporate Author: | United States. Congress. Senate. Committee on Energy and Natural Resources. Subcommittee on Water and Power (Author) |
---|---|
Format: | Online |
Language: | English |
Published: |
Washington :
U.S. Government Printing Office,
1986.
|
Series: | U.S. Congressional documents. Congressional hearings.
|
Subjects: | |
Online Access: | HeinOnline U.S. Congressional Documents Collection |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Lake Andes-Wagner project : hearing before the Subcommittee on Water and Power of the Committee on Energy and Natural Resources, United States Senate, Ninety-ninth Congress, first session, on S. 252 ... Wagner, SD, November 2, 1985
Published: (1986) -
Mid-Dakota Rural Water System Act of 1989 and Lake Andes-Wagner/Marty II units : hearing before the Subcommittee on Water and Power of the Committee on Energy and Natural Resources, United States Senate, One Hundred First Congress, second session, on S. 1765 ... S. 2710 ... June 19, 1990
Published: (1990) -
South Dakota water resource development projects : hearing before the Subcommittee on Water and Power of the Committee on Energy and Natural Resources, United States Senate, One Hundredth Congress, first session on S. 1416 to authorize the Lyman-Jones, west river, and Oglala Sioux rural water development projects, S. 1431 to authorize the Secretary of the Interior to construct, operate, and maintain the lake Andes-Wagner unit and the Marty II unit, South Dakota pumping division, Pick-Solan Missouri Basin Program, South Dakota, December 15, 1987
Published: (1988) -
O'Neill Unit : hearing before the Subcommittee on Water and Power Resources of the Committee on Interior and Insular Affairs, House of Representatives, Ninety-ninth Congress, first session on H.R. 1590 and H.R. 1264, to authorize the Secretary of the Interior to modify the construction, operation, and maintenance of the O'Neill Unit, Pick-Sloan Missouri Basin Program, Nebraska, to deauthorize the O'Neill Unit of the Missouri River Basin Project in Nebraska, and for other purposes : hearing held in Washington, DC, March 21, 1985.
Published: (1985) -
Dickinson Dam and Pollock-Herreid Unit : Pick-Sloan Missouri Basin programs : hearing before the Subcommittee on Energy Research and Water Resources of the Committee on Interior and Insular Affairs, United States Senate, Ninety-fourth Congress, first session on S. 2089, a bill to authorize modifications to Dickinson Dam, Dickinson Unit, Pick-Sloan Missouri Basin Program, North Dakota, and for other purposes : S 2493, a bill to authorize the Secretary of the Interior to construct, operate, and maintain the Pollock-Herreid Unit, South Dakota Pumping Division, Pick-Sloan Missouri Basin Program, South Dakota, and for other purposes, October 30, 1975.
Published: (1975)